Village of Waterford DPW
- Date: 1997 – Current
- Client: Village of Waterford DPW
- Project Type: Controls/SCADA
About this Project
Designed, built, programming, and installation of the master control system for the department of public works water utility, for controlling fresh and waste water as it moves through the village. Including remote telemetry, hot backup redundant systems, and alarming. The Village has an extensive network of sites that are all monitored and/or controlled by our systems. Numerous upgrades including both hardware and software changes over the last 17 years.
